EAPP Technical Documents

Technical Documents

Welcome to the Technical Resources Page l. Here, you will find a variety of resources related to our operations and infrastructure, including master plans, grid codes, project reports, and transmission infrastructure reports.

Master Plans: Our master plans provide a comprehensive overview of A Power Pool’s long-term vision and strategic goals for the electricity sector. These plans cover a range of topics, such as renewable energy integration, grid modernization, and demand-side management.

Grid Code: Our grid code outlines the technical requirements and operational procedures for connecting and operating within the A Power Pool electricity grid. This code ensures the safe and reliable operation of the grid while promoting competition and transparency in the electricity market.

Project Reports: Our project reports provide detailed information on our various electricity projects, including renewable energy installations, transmission line expansions, and substation upgrades. These reports offer insight into the technical, economic, and environmental aspects of each project.

Transmission Infrastructure Reports: Our transmission infrastructure reports provide an overview of the A Power Pool’s transmission system, including the location and capacity of transmission lines, substations, and other key infrastructure. These reports also highlight any planned or ongoing upgrades or maintenance work.

We hope these resources will be useful to you as you learn more about A Power Pool and our commitment to delivering safe, reliable, and sustainable electricity to our customers. Please feel free to contact us if you have any questions or require further information.

MASTER PLAN 2014 REPORTSYEARDOWNLOAD
EAPP Master Plan 2014 – Executive Summary
2014
EAPP Master Plan 2014 – Vol I Main Report
2014
EAPP Master Plan 2014 – Vol II Data Report
2014
EAPP Master Plan 2014 – Vol III Results Report
2014
Environmental Analysis Report
2014
Planning Gap Analysis
2014
Regional interconnections – status memo
2014
Report PSS-E task
2014

MASTER 2011 REPORTSYEARDOWNLOAD
EAPP Master Plan 2014 – Executive Summary
2014

STRATEGIC PLANS & ACTION PLANsYEARDOWNLOAD
EAPP Master Plan 2014 – Executive Summary
2014

EAPP GRID CODEYEARDOWNLOAD
EAPP Master Plan 2014 – Executive Summary
2011

HOA – REGIONAL POWER TRANSMISSION PROJECT – ESIA DOCUMENTSYEARDownload
ESIA Jigjiga – Togo Wajaale High Voltage Transmission Line2025
Labour Management Procedure Jigjiga TogoWajaale High Voltage Transmission Line2025
SEA Action Plan Jigjiga – Togo Wajaale High Voltage Transmission Line2025
Security Management Plan Jigjiga – Togo Wajaale High Voltage Transmission2025
Stakeholder Engagement Plan Jigjiga TogoWajale High Voltage Transmission Line2025
Traffic Management Plan Jigjiga – Togo Wajaale High Voltage Transmission Line2025

HOA – REGIONAL POWER TRANSMISSION PROJECT – ESIA DOCUMENTS (DEBRA ZEIT)YEARDownload
ESIA_Debre-zeit_Hurso2025
BMP_Debre-zeit_Hurso2025
SEP_Debre-zeit_Hurso2025
LMP_Debre-zeit_Hurso2025
SEA_SH_Debre-zeit_Hurso2025
WATER-PLAN_Debre-zeit_Hurso2025
WASTE MGT_Debre-zeit_Hurso2025
SECURITY MGT_Debre-zeit_Hurso2025
TRAFFFIC MGT_Debre-zeit_Hurso2025
CAMP MGT_Debre-zeit_Hurso2025

HOA – REGIONAL POWER TRANSMISSION PROJECT – ESIA DOCUMENTS (SOMALILAND)YEARDownload
1_ESIA_SOMALILAND_TL2025
2_BIODIVERSITY PLAN2025
3_SEP2025
4_LABOUR_MGT_PLAN2025
5_SEA_SH_ACTION PLAN2025
6_WATER_RESOURCE_ASSES2025
7_WASTE_MGT_PLAN2025
8_SECURITY_MGT_PLAN2025
9_TRAFFIC_MGT_PLAN2025
10_CAMP_MGT_PLAN2025
11_ToR_BIODIVERSITY2025

Scroll to Top